Seeking expressions of interest for qualified and experienced Electricians for an upcoming temporary power station demobilization project, anticipated to commence around 20th September 2026 (TBC).
Scope of Works
The project involves the safe electrical isolation, disconnection and demobilization of a temporary power generation installation, including:
- 6 × generators
- 1 × 6-pack transformer system
- 2 × HV transformers
- 2 × load banks
- Isolation and disconnection of associated power cables, control wiring and electrical connections
- Identification, labelling and preparation of disconnected cables and equipment for demobilisation
- Assisting with the safe removal and pack-down of electrical equipment
- Working in accordance with site electrical and safety procedures
- General electrical duties associated with the demobilisation works
We are looking for electricians who are safety-focused, reliable and able to work efficiently as part of a project team. Mine site experience is preferred or commercial electrical experience.
Experience with temporary power systems, generators, transformers, industrial electrical installations and/or HV environments will be highly regarded.
Ongoing Opportunities:
While this engagement is initially for the upcoming demobilisation project, there is potential for ongoing project work with MF TradeSync Industries for high-performing electricians, based on performance, reliability and future project requirements.
Anticipated commencement: Around 20 September 2026 – TBC
Please note: This is currently an Expression of Interest for anticipated project work. Project dates and requirements are subject to final confirmation.
Benefits include:
Free flights and accommodation, food and laundry included when on site.
Pay: $800.00 per day
Work Location: On the road