The Project
The Alkimos Desalination Plant Project includes the design, construction, operation and maintenance of the plant with first production in 2028. Works include marine works and tunnels, seawater intake system, a seawater reverse osmosis desalination plant, groundwater system, drinking water storage and pump system, supported by civil, electrical and bulk earthworks.
Why ACCIONA
Flagship project with strong visibility across the industry
Multi-disciplinary team, build relationships across trades
Long term, stable work
Additional works coming, more opportunities ahead
The Role
You'll plan and carry out lifts across the site, working with cranes, EWPs and other lifting equipment to move plant and materials safely into place. Day to day, you'll set slings and rigging gear, direct crane operators, and inspect equipment before each lift. You'll work closely with crane operators, boilermakers and site supervisors to keep every lift on schedule and on spec.